Mineral Resources HQ
Osborne Park, WA
Project Type
Commercial
Sector
Mining
Location
Ken’s Bore, WA
Size
178,000 sqm
Status
Under Construction
Prone to the harsh climate conditions of the Pilbara, the architectural design focused on material durability, with prefinished materials used in the built form to withstand and endure the site environment. In collaboration with Aspect Studio, the landscape design incorporates native plants and natural swales to complement the environment and manage stormwater flow.
Discover our unique approach to the synergy of design and construction.